
EARTHTRONICS ETHKIT10662LB10527DCFILH ETH10662LB10527DCFIL W ADP
Description
Becker' Smart Com 150 and Smart Com 150IS Termination units are required at the end of each Leaky Feeder cable branch to absorb RF signals, preventing reflections and ´distortion. Alternately, Stope antennas (RNG-AN1, RIS-AN1) can be installed at the end of Leaky Feeder branches to extend coverage into stopes or areas where cable damage is likely.